Just Sharing This A 10 way diseqc switch

..In actual fact I now have 18 inputs ...which can either be fixed or motorised ..
The lnbs can either be on Tom Dick or Harry ...or fixed as in the Sky Mini ...or mounted as offset lnbs on either Carl or Christina ...
..and just look how many vacant inputs I now have ...
What a breakthrough..
:)
rgds
VS
 

Attachments

  • Diseqc Schematic Latest.webp
    Diseqc Schematic Latest.webp
    23.8 KB · Views: 158
Mad. Just mad ........ <_<
 
Oooo me like multswitches
 
Starting to take shape now ...
though you might not think so from the photo .
I calls it organised chaos ..
..and not finished yet..but fully functional atm..
rgds
VS
 

Attachments

  • DSCF0110.webp
    DSCF0110.webp
    200.8 KB · Views: 108
Starting to take shape now ...
though you might not think so from the photo .
I calls it organised chaos ..
..and not finished yet..but fully functional atm..
rgds
VS
Chaos theory had been proven true by that photo!
 
Do you mean you're not sure where the Cat is?
 
Lets not get started on the discussion of shrodinger....
 
But i can confirm that at the moment my cat has gone sleep in the better halves jigsaw box, while she attempts to finish it,therefore i know where my moggy is...
 
...Had another flash of inspiration ..
Now that I have extra inputs ...I thought Id try this and it works ...thanks to those Yankee fellows..
The SL3 as you know has 4 outputs driven to 4 seperate f connector outputs ..but I only use one ..
So ..took down the SL3 opened her up and re-connected one of the redundant F's ..
Thus I can drive 2 outputs (isolated).
I then borrowed the Ku line and connected this to the reconnected F..
This means I have 2 identical signals arriving in the loft ..
I then connected the borrowed ku line to a second SUP-2400 ..
This one is NOT hard wired like the other ..

This one can be switched on and off using the Hex commands ...the other is hard wired to upconvert Ka band A making it accessible to the F15 or indeed any receiver ...
So by selecting Diseqc 1.0 (port 1) and Diseqc 1.1 (port 1) the F15 can receive Ka band A ...but if I select Diseqc 1.0 (port 1) and Diseqc 1.1 (port 2) I get the unconverted output from the SL3 ie Ka band B ...which I can scan with the F15.
This means I wont have to keep swapping the SUP-2400s to use switchable and non switchable ..(The TBS card like the switchable SUP) ..as it can control the switching ..whereas the F15 cannot..
Clear as mud eh ;)
The cost ...I will have to run yet another cable from the loft to Carl (SL3 line 2)
A job for another day ..the point is ..It's doable ..and I no longer need to persue construction of a diseqc generator..
Problem solved..

Just as an addition ..and not really relevant to diseqc switching ...this is for Llew..
The SiS news feed you were persuing (Ka band A ) ..does switch from the office view to live feeds regularly ..
Tonight at around 10db ..I caught live links (Live Bongs ..lol) for the ITV news ..
See the attached 10 pics ..and there was even audio this time..
rgds
VS
 

Attachments

  • DSCF0115.webp
    DSCF0115.webp
    52.6 KB · Views: 61
  • DSCF0116.webp
    DSCF0116.webp
    100 KB · Views: 56
  • DSCF0118.webp
    DSCF0118.webp
    34.7 KB · Views: 54
  • DSCF0117.webp
    DSCF0117.webp
    82.1 KB · Views: 55
  • DSCF0119.webp
    DSCF0119.webp
    53.9 KB · Views: 56
  • DSCF0111.webp
    DSCF0111.webp
    58.8 KB · Views: 58
  • DSCF0112.webp
    DSCF0112.webp
    72.7 KB · Views: 57
  • DSCF0113.webp
    DSCF0113.webp
    57.8 KB · Views: 58
  • DSCF0120.webp
    DSCF0120.webp
    74.8 KB · Views: 55
  • DSCF0121.webp
    DSCF0121.webp
    84.7 KB · Views: 57
Help !! ..
my madness is still gaining traction ..
Another 100m reel of cable comes to an end ..
Inspired by the recent success with creating 18 inputs to my complex switch system ..and utilisation of a second output from the SL3 ..plus the addition of a C band LNB to Carl ..I needed more ports/cable connections ..
Granted I only needed 2 more ..but it's such a messy job ..
Why install 2 lines when there is enough cable for 3 ..so..
Another load of cutting of paving slabs ..
Another length of 36mm waste pipe going in and 3 more lengths of all copper cable ..
I might also run another length of 8 core control cable ..just in case I ever make Carl motorised declination capable ..

I ache sommink chronic now ...but feel both justified and satisfied I made the descision ...but I suspect I am a possibly a bit mad ..
;)
 

Attachments

  • DSCF0125.webp
    DSCF0125.webp
    155.8 KB · Views: 73
  • DSCF0126.webp
    DSCF0126.webp
    158.5 KB · Views: 72
  • DSCF0127.webp
    DSCF0127.webp
    138.2 KB · Views: 73
  • DSCF0128.webp
    DSCF0128.webp
    171.7 KB · Views: 73
Just so crazy!!!!
 
Stopped raining long enough to get a bit done ..
Hopefully restore the cut surface soon ..
here are some pics ..
I now have 5 lnb connections in use ..and one spare line ..
C band ..(C1 PLL)
Ku band (Inverto ultra dual)
Ka band D (XMW PLL)
Ka band A (SL3 1)
Ka band B (Sl3 2)

..nice ;)
 

Attachments

  • DSCF0129.webp
    DSCF0129.webp
    155.3 KB · Views: 67
  • DSCF0130.webp
    DSCF0130.webp
    142 KB · Views: 60
  • DSCF0131.webp
    DSCF0131.webp
    136.9 KB · Views: 60
  • DSCF0132.webp
    DSCF0132.webp
    61 KB · Views: 62
  • DSCF0133.webp
    DSCF0133.webp
    83.9 KB · Views: 63
  • DSCF0134.webp
    DSCF0134.webp
    135.6 KB · Views: 72
Last edited:
Back
Top